Available Classifications
Alternate structures
Alphabetical Indexes
Correspondence Tables
Registry entries (corrections, case laws, ...)
Search the Registry
  
  
  
Free downloads
  
  
  
International Family of Classifications
National classifications
Meetings
  Statistical Commission
  Expert Group
  Technical Subgroup
  Workshops and Training
Newsletter
  Mailing list
Contact us
  
  
  
ISIC Rev.4
ISIC Rev.3.1
ISIC Rev.3
CPC Ver.2
CPC Ver.1.1
CPC Ver.1.0
SITC Rev.4
SITC Rev.3
more ...
 
ISIC 3 index
CPC 1.1 index
  
  

Printer friendly versionPrinter friendly version English  Français  Español  

Detailed structure and explanatory notes

COPP code 06.1.0

Structure   

Hierarchy
  • Division: 06 - Outlays on current production programmes, administration and management
  • Group: 06.1 - Outlays on current production programmes
  • Class: 06.1.0 - Outlays on current production programmes

Explanatory note

- Outlays on direct costs, namely, labour and materials, fabricated and semi-fabricated parts, supplies, etc.; direct overhead expenditures, namely, production supervision and associated clerical staff; outlays on tools, production machinery and long-lived equipment, buildings housing the production activities and transport equipment.
Includes: expenditures on other items intimately connected with the production programme (internal transportation of work in progress, on-line inspection staff).
Excludes: outlays on design (01.2); construction and testing of prototypes, laboratory personnel and equipment (02.1).







Would you like to leave some feedback?
(on this code, this classification, the site in general or any other issue)

Then drop us a line at CHL@un.org.