English  Français  Español  

Detailed structure and explanatory notes

COPP code 01

Structure   

Hierarchy
  • Division: 01 - Outlays on infrastructure

Breakdown:

This Division is divided into the following Groups:

  • 01.1 - Outlays on road and land construction and improvement
  • 01.2 - Outlays on engineering and related technological work
  • 01.3 - Outlays on information management

Explanatory note

Outlays on infrastructure to keep and extend the infrastructural capacity of the establishment and its potential for growth and productivity.
Excludes: expenditures on R&D (02); education and training (05.1); marketing (04); gross capital formation that can be related specifically to other objectives (02) to (06).







Would you like to leave some feedback?
(on this code, this classification, the site in general or any other issue)

Then drop us a line at CHL@un.org.