Available Classifications
Alternate structures
Alphabetical Indexes
Correspondence Tables
Free downloads
International Family of Classifications
  Best practices
National classifications
  Statistical Commission
  Expert Group
  Technical Subgroup
  Workshops and Training
  Mailing list
Contact us
ISIC Rev.4
ISIC Rev.3.1
ISIC Rev.3
CPC Ver.2.1
CPC Ver.2
CPC Ver.1.1
CPC Ver.1.0
SITC Rev.4
SITC Rev.3
more ...
ISIC 3 index
CPC 1.1 index

Printer friendly versionPrinter friendly version English  Français  Español  

Detailed structure and explanatory notes

COPP code 01


  • Division: 01 - Outlays on infrastructure


This Division is divided into the following Groups:

  • 01.1 - Outlays on road and land construction and improvement
  • 01.2 - Outlays on engineering and related technological work
  • 01.3 - Outlays on information management

Explanatory note

Outlays on infrastructure to keep and extend the infrastructural capacity of the establishment and its potential for growth and productivity.
Excludes: expenditures on R&D (02); education and training (05.1); marketing (04); gross capital formation that can be related specifically to other objectives (02) to (06).

Would you like to leave some feedback?
(on this code, this classification, the site in general or any other issue)

Then drop us a line at CHL@un.org.