|
****JavaScript based drop down DHTML menu generated by NavStudio. (OpenCube Inc. - http://www.opencube.com)****
|
|
Detailed structure and explanatory notesISIC Rev.3.1 code 4510StructureHierarchy
Explanatory note This class includes: - demolition or wrecking of buildings and other structures - clearing of building sites - earth moving: excavation, landfill, levelling and grading of construction sites, trench digging, rock removal, blasting etc. - stripping work of contaminated topsoil as part of construction activities - site preparation for mining: · overburden removal and other development and preparation of mineral properties and sites, except oil and gas sites - test drilling, test boring and core sampling for construction, geophysical, geologic or similar purposes This class also includes: - building site drainage - drainage of agricultural or forestry land - clearing of mines and the like (including detonation) from construction sites This class excludes: - drilling of production oil or gas wells, see 1110 (when on own account) or 1120 (when on a fee or contract basis) - water well drilling, see 4520 - shaft sinking, see 4520 - oil and gas field exploration, geophysical, geologic and seismic surveying, see 7421 - decontamination of soil, see 9000 Click here for complete correspondences for this code. Click here to see the alphabetical index for this code Would you like to leave some feedback? (on this code, this classification, the site in general or any other issue) You can include contact info (optional) |